My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012952 SSCRPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2600 - Land Use Program
>
UP-7-95
>
SU0012952 SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 10:03:22 AM
Creation date
9/4/2019 11:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SU0012952
PE
2626
FACILITY_NAME
UP-7-95
STREET_NUMBER
2705
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204-
APN
12308029
ENTERED_DATE
1/16/2020 12:00:00 AM
SITE_LOCATION
2705 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2103\SSC RPT.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERRA VAC <br /> sparging as an alternate technology. The use of air sparging systems to strip hydrocarbons <br /> from the saturated zone and enhance biodegradation have been proven to be an effective <br /> remediation tool. Therefore, an air sparge system will augment the VE system. Captured <br /> vapors will be incinerated prior to discharge to the atmosphere. Based upon past <br /> experience, the total cost of this remediation method is less than $250,000. Additionally <br /> the time s <br /> required to remediate the site to the RBCA established q ed clean up goals for benzene <br /> would be considerably shorter (estimated at 12 to 18 months) than excavation. <br /> 10. RECOMMENDATION <br /> Terra Vac recommends that the site be remediated using aacce roven and ted <br /> p p <br /> technology, specifically dual vapor extraction and air sparging. Estimated costs and the <br /> estimated 12 to 18 months to completion form the basis of this recommendation. <br /> ORC applications may be used as a final "polishing" step in the remediation after the bulk <br /> of the contamination is removed. The use of ORCs at this stage of the remediation would <br /> be economical. <br /> i <br /> 1 <br /> I <br /> I <br /> i <br /> 4 <br /> Project 30-0212 14 c:Wton130-02121caplrev5lcap-rev5.doc <br /> July 15, 1998 <br /> l,s-Mct—ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.