Laserfiche WebLink
TECHNICAL APPROACH <br /> The technical approach to this project will be to perform the following work tasks: <br /> • Perform a document review of the PHS-EHD file for this site and nearby sites. <br /> • Perform a 2,000-foot radius well survey to ascertain proximity of registered wells to the site. <br /> • Review the on-site well log and construction details to ascertain sanitary seal depth and sample the <br /> well. <br /> • Perform a reconnaissance, preliminary site vertical and horizontal subsurface investigation to collect <br /> soil and groundwater samples in the former tank pit areas and in the assumed groundwater <br /> downgradient flow direction(to the uppermost aquifer and top of the underlying aquitard). <br /> • Prepare a site preliminary site investigation report. <br /> WORKPLAN <br /> State Fund Application <br /> Wright will assist property owner with application to the Fund for reimbursement of clean up costs, <br /> consistent with Fund requirements. <br /> Well Survey <br /> Wright will conduct a well survey of available regulatory (State, County, City databases or files) for <br /> known registered well locations. In addition, review databases for listed sites within %z mile and review <br /> readily available records within 2000 feet which may contain well location information. The survey will <br /> present the results of those file searches; please note that agency files may contain incompletely filled logs <br /> or forms depending upon the completeness of the water well drillers forms at the time of those forms' <br /> preparation. <br /> On-site Well Samplin¢ <br /> The on-site water well will be sampled using the existing pumping equipment in the well. Depth to <br /> groundwater measurements will be attempted in the sounding port and measured to the nearest one-one <br /> hundredth of one foot. The well will be purged to clear the lines and draw aquifer water. As the purge <br /> volume is removed,a measurement of pH,electrical conductivity and temperature will be recorded prior to <br /> sampling. The sample will be carefully collected and poured into the appropriate laboratory prepared <br /> containers with minimum cavitation. The water sample will be labeled, logged onto a chain-of-custody <br /> form, and placed in a chilled ice chest on crushed ice. Wright will request a copy of the well log and <br /> construciton detail from the owner. <br /> Exploratory Borings <br /> Up to six exploratory borings will be drilled at the site (Figure 2). Drilling and well installation permits <br /> will be secured from PHS-EHD, and all utilities will be cleared prior to doing the fieldwork. The <br /> exploratory boreholes will be positioned in the former tank pits, and in the assumed downgradient flow <br /> directions as shown on Figure 1. The boreholes will be advanced to locate the capillary fringe vicinity, <br /> upper contact of the uppermost water bearing strata (aquifer) and continued to the lower contact of the <br /> aquifer(upper contact of the aquitard)J Borehole total depths are estimated to be about 20-25-feet deep for <br /> this study, however, the boreholes will be advanced to the upper aquitard contact. The boreholes are <br /> positioned to assess contaminant presence in the former tank pits and potential downgradient extent of <br /> contaminant movement from the two tank sources. <br /> The boreholes for this reconnaissance assessment will be drilled with truck mounted direct push drilling <br /> equipment. It is anticipated that a GeoProbe rig will be used to collect soil and groundwater samples <br /> since the site has limited access within the low ceiling storage canopy. The Geoprobe can push soil <br /> sample collection tools to discrete depths as desired. <br />