Laserfiche WebLink
I& Shawn Kellet + <br /> Page 3 <br /> December 9, 1999 <br /> The boreholes will be drilled with tm* mounted hollow stem auger m direct push drilling equipment. <br /> All drilling equipment and sampling tools will be cleaned prior to arriving, and before]raving the site. <br /> The sample devices will be advanced to the desired sampling depth interval, and a drive split spoon <br /> M mpler will be drives into undisturbed soil. The sampler will then be retrieved and dissembled,and the <br /> soil filled brass lioers;if remised for chemical analysis,win be sealed with Teflon*papa and plastic cod <br /> caps, labeled, kWed onto cbam-of-custody forms and place in a chilled ice cleat. Following soil <br /> sampling each bore bole will be prepmed for recouaaiustrce groundwater sampling using temporary 3% <br /> iuch PVC well camngc. <br /> Ile boreholes will be logged using the Umfied Soil Classification System undo the supervision of a <br /> registered geologist using the attached Geoscience protocols Wright has developed for dolling ten ng. <br /> temporary well mon,well construction and sampling Additional Who logic information will be <br /> collected to dace-be the uremrfece gmlogq. The samples will be colleted at minimum five fiw <br /> lutervals. at intervals of obvious contamination (field screened by vapor pod meas)and at shaMm*c <br /> feaures of interest. Borehole depths are anticipated to be about 15-feet deep for this <br /> reconnaissance. <br /> MgN usdwxter S '!g <br /> Each hole l be pulled using calculated well volumes based upon the depth to water is cath casing. <br /> Depth undwater measurements will be made to the nearest one-one hundredth of one foot from <br /> existing grade,a0 also checled for the lueseoee of separate phase pmdoct The Fuwuhr m sample will <br /> be cudully corrected with a clean bailer and pound mto the appmpeaw mborstory,prepared container <br /> with minimum ctvitatior. F'ch water sample will be labeled, logged onto a chain-of-cvstod_r form, and <br /> placed m a chilled ice chest for transportation to a state certified laboratory for analyses as Ind rated <br /> below. Upon completion of the borehole drilling and collection of information, the boreholes will be <br /> b wkmed with grout,placed fiom the bottom to top of the borehole. The pawed surface will be patched <br /> with quick setting concrete or asphalt,to match rusting <br /> In addition, the borehole sonographic and chemical analytical data will be revmwed to ascertain the need <br /> fiw and positioning of gnundrwrter mordsonng wells Should gmumdwatcr-monitoring weft be rewitW <br /> thea the following wen installation procedttr m would be used. 2 <br /> Cbl sl."Analysis <br /> Up to six(6)capillary fimp soil mess, ria(6)vadose woe soil samples,one(1)Wgurd sample and <br /> six(6)groundwater samples will be analyzed at a State certified analytical labonlow from the exploratory <br /> Wrings. These samples will be tested for the following. Total Petroleum Hydrocarbons as G=hw <br /> (IFHG)Diesel(MID),Benzene(B).Toluene Cr'),Ethyl-benzene(E)and Xylene M.Methyl-tert-lasyl- <br /> ether (MPBE) and fuel. Oxygenates, 1.1 Dichlomethane and Ethylene Ihbromi& using EPA Methods <br /> 351018015,9020,sad 9260.The analyses will be rim on a normal turnaround <br /> PHASE TWO <br /> Monitoring well Iesfalmtioo <br /> Three monitoring wells will be iustallod using the sox exploratory borel+eles dam to Ioctte the wells far <br /> long tam plume monitoring The wells will be rased with Schedule 40 PVC caststug, threaded together, <br /> glues will tat be used.The slatted interval will be a 0.020-inch slot and the annular space around the slob <br /> will be baddined with 212-size sand.Previous experience Las shows this to be a reliable well dugs in <br /> fine grained and stratified depositional environments. Final well design will be modified to the site- <br /> specific conditions encountered in the borehole dorm drilling Once the aquifer dram have been defined, <br />