Laserfiche WebLink
I <br /> our staff technician located the two domestic wells on the site <br /> (Figure 1 ) but was not able to get any information on the, screen <br /> intervals for these wells. Also, the staff at Westorn Stone was <br /> only able to give an approximate pumping rate of 50-60 gallons <br /> per minute for the wells. <br /> Section 2.9 <br /> The site is not connected to the municipal sewer service, as we <br /> originally thought, but has a septic tank. The location of the <br /> tank is shown on Figure 1, but the location of the leach lines <br /> 0 <br /> are unknown at this time. <br /> WaterWork will continue with the quarterly monitoring program. <br /> We expect to submit the next quarterly report by February of <br /> 1991. if you have any questions regarding this project, please <br /> contact either Lois Frantz or Hill Channell at your convenience, <br /> Respectfully, <br /> WaterWork <br /> Bill Channell. <br /> Senior Geologist <br /> Russell W. Juncal, <br /> Registered Geologist No. 3864 <br /> LF/tdp <br /> i <br /> I ,5 <br /> 1 <br />