Laserfiche WebLink
Our staff technician located the two domestic wells on the site <br /> (Figure 1 ) but was not able to get any information on the screen <br /> intervals for these wells. Also, the staff at Western Stone was <br /> only able to give an approximate pumping rate of 50-50 gallons <br /> per minute for the wells. <br /> Section 2.9 <br /> The site is not connected to the municipal sewer service, as we <br /> originally thought, but has a septic tank. The locution of the <br /> tank is shown on Figure 1; but the location of the, leach lines <br /> are unknown at this time. <br /> J <br /> WrterVbrk will continue with the quarterly monitoring program. <br /> We expect to submit the next quarterly report by February of <br /> 1991. If you have any questions regarding this project, please <br /> contact either Lois Frantz or Rill Channell at your convenience. <br /> Respectfully, <br /> WaterWork - <br /> HL'11 Channell <br /> Senior Geologist <br /> 1 <br /> Russell W. Juncal <br /> Registered Geologist No. 3554 <br /> LF/tdp <br /> -1 <br />