Geelegicat Technics Inc. '"' Page 2 <br /> VETS Work Plan <br /> Project No. 750.2 <br /> February 12,2004 <br /> On June 12, 2000, GTI and Del-Tcch Geo Technical performed a vapor extraction pilot test <br /> at the site. Laboratory and field test results indicate the site is conducive to remediation by <br /> �a val'ar extraction. <br /> On June 12. 2000, Ms. Lori Duncan of SJC PHS/hHD requested in writing that a work plan <br /> be prepared to define the lateral and vertical extent of the groundwater plume at the site. On <br /> June 29, 2000, GTI prepared a work plan proposing the installation of two water table <br /> monitoring wells and one deep, discretely screened monitoring well. Ms Duncan approved <br /> the work plan on July 7, 2000. The work was performed during the week of October 16, <br /> 2000. <br /> On January 30, 2001, GTI prepared and submitted the Corr•ecti►�e Action Plast (Revised) <br /> t'ado.ve Zone Remediation. The CAP discusses GTI's proposed methodology for mitigation <br /> of the documented petroleum hydrocarbon contamination at the site by vapor extraction. <br /> The CAP also discusses the confirmation testing outlined in this work plan. The CAP, as <br /> submitted, was approved by Ms Duncan in a letter dated April 02, 2001 <br /> In February 2002 the soil vapor extraction system was initiated and has operated for the past <br /> year. Contaminant mass estimate calculations show that approximately 50% of the <br /> petroleum hydrocarbons contained in the subsurface at this site has been removed. The <br /> groundwater at this site is free of petroleum hydrocarbon contamination and possibly as <br /> much as 600 gallons of gasoline may remain in the vadose zone. <br /> On March 28, 2003, GTI submitted a work plan for additional site characterization. The <br /> work plan was approved, with reservation, by Lori Duncan in a letter dated April 8, 2003. <br /> On September 5, 2003, GTI and Gregg Drilling installed, logged and sampled two soil <br /> borings. The soil borings revealed that the bulk of the contamination has been removcd <br /> from the site. Details are discussed in the Interim Soil Investigation Report dated October 2. <br /> 2003. <br /> On December 9, 2003, a source test was conducted on the internal combustion engine (VC), <br /> San Joaquin Valley Unified Air Pollution Control District (SJCUAPCD) Authority to <br /> Construct (N-4546-2-0). The I/C failed to comply with the VOC limits established by the <br /> SJCUAPCD. On January 14, 2004, the I/C was shut down. <br /> This work plan discusses modifying the vapor extraction treatment system (VETS). GTI. <br /> proposes to pull vapors from the vadose zone with a blower and treating the vapors with <br /> Granular Activated Carbon (GAC). <br />