Laserfiche WebLink
page 2, .1305 Escalon Ave. <br /> a <br /> The CAP discusses GTI's proposed methodology for mitigation of the <br /> documented petroleum hydrocarbon contamination at this site by soil vapor <br /> extraction. The CAP, as submitted, is approved. Forty-eight hours notice to <br /> PHS/EHD is required prior to all site fieldwork. If you have any questions or need <br /> to schedule fieldwork please call Lori Duncan at (209) 468-0337. <br /> I <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Ler� <br /> Lori Duncan, Senior REHS Dot Lofstrom, RG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: Marty Hartzell, CVRWQCB <br /> Ray Kablanow, GTI <br /> I <br /> 4 <br /> f <br /> J <br /> { <br />