My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 4:53:54 PM
Creation date
9/4/2019 4:27:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i GCO�D�tCa(TecfmicS inn' - <br /> City of <br /> Esc aIon Page 3 <br /> f Cost Pre-Approval <br /> Project 750.2 <br /> April 23, 1999 <br /> C <br /> • Provide Equipment and Supplies needed to conduct the Feasibility Stud <br /> 1 day in field pp t3' y pilot test <br /> • meters & monitors ; <br /> ' Thermal Oxidizer(TO) and other extraction/treatnient equipment <br /> sample analysis �g p <br /> • Prepare a Feasibility Study Report <br /> ! + The supplemental fuel for the TO will be propane since there is not a natural gas supply <br /> ! to this property. The supplier for the propane will lie J. S. West. This company has <br /> supplied propane for several other VETS projects run by GTI and have been found to be <br /> very cost effective and reliable. The unit cost is $0.85/gallon with no set up or delivery <br /> charges. <br /> 5. Excavation Backfill & Soil Stockpile Disposal <br /> + Contractors hired by the City of Escalon have been retained to back.fill the_excavation_and <br /> ansport ani-dispose of the soil'stockplle at Forward Landfill. <br /> + This work must be performed prior to the drilling and trenching work can be performed. <br /> Tentative Schedule for Implementing Work <br /> The proposed schedule for the additional site characterization work and feasibility study is as <br /> follows: <br /> Task Descriptio Tentative Completion Date <br /> • Receive Cost approval from the Fund April 27, 1999 <br /> • Install MW-1, 2, 101 and VEW-1, 2, 3, 4 <br /> April 29 & 30, 1999 <br /> • Trench & Install SVE piping for MW-1, 2, 101 and <br /> VEW-I, 2, 3, 4 May 3 & 4, 1999 <br /> • Install MW-3 May 19, 1999 <br /> • Trench & Install SVE piping for MW-3 May 20, 1999 <br /> • Perform Vapor Extraction Pilot Test May 27 & 28, 1999 <br /> • Submit Well Installation Report June 14 1999 <br /> • Submit Pilot Test Report June 30 1999 <br /> --- � • ank you�for your attentton';to this project: Call-rne if you Have-4uestions or need clarification. <br /> My phone number is (209) 538-6424. „ <br /> Respectfully Submitted, <br /> Geologicaf7echnics Inc. <br /> Raynold I. Kablanow II, Ph.D. <br /> cc: Doug Stiham- City of Escalon <br /> Lori Duncan- SJC <br /> Gordon Boggs-- CRWQC13-CVR <br /> �4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.