Laserfiche WebLink
Ms. Mo Hatef - 2 - 1 November 2012 <br /> San Joaquin County <br /> If the applicant qualifies for coverage under the waiver, they must submit a Report of Waste <br /> Discharge (RWD) that includes the following: <br /> 1. A completed and signed Form 200; <br /> 2. A completed and signed Form 200-R5-FP; <br /> 3. A check for $1,521 made payable to State Water Resources Control Board; and <br /> 4. A copy of the environmental document prepared by the local planning department <br /> pursuant to the California Environmental Quality Act (CEQA). Acceptable CEQA <br /> documents include a Notice of Determination with a copy of the Negative Declaration or <br /> Final Environmental Impact Report (as applicable). <br /> Construction Stormwater Permit <br /> A National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water <br /> Discharges Associated with Construction Activities, Order No. 99-28-DWQ is required when a <br /> project involves clearing, grading, disturbances to the ground, such as stockpiling, or <br /> excavation. Currently, construction activity that involves soil disturbances on construction sites <br /> one acre or greater or which are part of a larger common plan of development or sale require a <br /> construction storm water permit. <br /> If construction associated with the project will disturb more than one acre, the property owner <br /> will need to obtain permit coverage under the NPDES General Permit No. CAS000002 for <br /> Discharges of Storm Water Associated with Construction Activity. Before construction begins, <br /> the proponent must submit a Notice of Intent (NOI) to comply with the permit to the State Water <br /> Resources Control Board and a Stormwater Pollution Prevention Plan (SWPPP) must be <br /> prepared. <br /> Industrial Stormwater Permit <br /> Depending on the Standard Industrial Classification (SIC) code of the final project, compliance <br /> with the NPDES General Permit No. CAS000001 for Discharges of Storm Water Associated <br /> with Industrial Activities may be required. The SIC codes of activities requiring coverage are <br /> listed in the General Permit. In order to obtain coverage by the General Permit, the proponent <br /> must submit an NO] to comply with the permit to the State Water Resources Control Board and <br /> an SWPPP must be prepared. <br /> Water Quality Certification - Wetlands <br /> If a U.S. Army Corp of Engineers (ACOE) permit is required due to the disturbance of wetlands, <br /> then a Water Quality Certification must be obtained from the Regional Board prior to initiation of <br /> project activities. Section 401 of the federal Clean Water Act requires that the project proponent <br /> for any project that impacts surface waters of the United States (such as streams and wetlands) <br /> must request a 401 Water Quality Certification from the Regional Board. Water Quality <br /> Certification must be obtained prior to initiation of project activities. The proponent must follow <br /> the ACOE 404(b)(1) Guidance to assure approval of their 401 Water Quality Certification <br /> application. The guidelines are as follows: <br />