My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012103
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0012103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 8:56:14 AM
Creation date
9/4/2019 5:28:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012103
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302041, 21302038
ENTERED_DATE
12/18/2018 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
12/28/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Supplemental fields
FilePath
\MIGRATIONS\D\DELTA\7300\PA-1800316\SU0012103\APPL.PDF \MIGRATIONS\D\DELTA\7300\PA-1800316\SU0012103\EH PERM.PDF \MIGRATIONS\D\DELTA\7300\PA-1800316\SU0012103\EHD COND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Stormwater Management Mosquito Control BMPs <br /> •Ensure Mosquito Control Agencies have access to infrastructure to inspect or make <br /> appropriate treatments when necessary. <br /> •Manage sprinkler and irrigation systems to minimize runoff entering stormwater <br /> infrastructure. <br /> -Avoid intentionally running water into stormwater systems by not washing <br /> sidewalks and driveways,washing cars on streets or driveways,etc. <br /> •Inspect facilities weekly during warm weather for the presence of standing water <br /> or immature mosquitoes. <br /> •Remove emergent vegetation and debris from gutters and channels that <br /> accumulate water. <br /> •Consider mosquito production during the design,construction,and maintenance <br /> of stormwater infrastructure. <br /> •Design and maintain systems to fully discharge captured water in 96 hours or <br /> less. <br /> • Include access for maintenance in system design. <br /> •Design systems with permanent water sources such as wetlands,ponds,sumps, <br /> and basins to minimize mosquito habitat and plan for routine larval mosquito <br /> inspection and control activities with the assistance of a local mosquito control <br /> program. <br /> Stormwater Treatment Ponds and Constructed Treatment Wetlands <br /> •Whenever possible,stock stormwater ponds and constructed wetlands with <br /> mosquito-eating fish available from local mosquito control programs. <br /> •Design and maintain accessible shorelines to allow`or periodic maintenance <br /> and/or control of emergent and shoreline vegetation and routine monitoring and <br /> control of mosquitoes. Emergent plant density should be routinely managed so <br /> mosquito predators can move throughout the vegetated areas and are not <br /> excluded from pond edges. <br /> Whenever possible,design and maintain deep zones in excess of four feet(1.2 <br /> m)to limit the spread of invasive emergent vegetation such as cattails. The <br /> edges below the water surface should be as steep as practicable and uniform to <br /> discourage dense plan'growth that may provide immature mosquitoes with <br /> refuge from predators and increased nutrient availability. <br /> •Use concrete or liners in shallow areas to discourage plant growth where <br /> vegetation is not necessary. <br /> •Whenever possible,provide a means for easy dewatering if needed. <br /> •Manage the spread and density of floating and submerged vegetation that <br /> encourages mosquito production(i.e.,water hyacinth,water primrose, parrot's <br /> feather,duckweed,and filamentous algal mats). <br /> •if possible,compartmentalize managed treatment wetlands so the maximum <br /> width of ponds does not exceed two times the effective distance(40 feet 1'2 m]) <br /> of land-based application technologies for mosquito control agents <br /> Reference: <br /> Best Management Practices for Mosquito Control In California(July 2012) <br /> Vector-Borne Diseaao Seotlon <br /> California Department of Public Haalth <br /> hitp'.(`YnY'N.W C5tn(IC.GB.CrOY(rO50r1 fCQS_p 1p <br /> Planning Commission Staff Report, Item # 1 02/06/2020 — PA-1800316 (UP) 15 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.