Laserfiche WebLink
Pacific Gas and Plan Review Team 'r3ERinRi aw ,ca cm <br /> Electric Company <br /> S!'+F.nitrwrr G-rayls Wi�rf 8.9%GA <br /> �s%�� 5�R Idrtror A 4A 83 <br /> January 3,2019 <br /> Giuseppe Sanfilippo <br /> County of San Joaquin <br /> 1810 East Hazelton Ave <br /> Stockton,CA 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Mr.Sanfilippo, <br /> Thank you for submitting PA-1800316(UP)plans for our review. PG&E will review the <br /> submitted plans in relationship to any existing Gas and Electric facilities within the project area. <br /> If the proposed project is adjacentlor within PG&E owned property andlor easements,we will be <br /> working with you to ensure compatible uses and activities near our facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities(Attachment 1) <br /> and Electric facilities(Attachment 2). Please review these in detail,as it is critical to ensure <br /> your safety and to protect PG&E's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 1. This plan review process does not replace the application process for PG&E gas or <br /> electric service your project may require. For these requests,please continue to work <br /> with PG&E Service Planning: In tips:11www.poe.comlen US/businesslservices?buildinc- <br /> and-renovation/overvriewtoverview.page. <br /> 2_ If the project being submitted is part of a larger project,please include the entire scope <br /> of your project,and not just a portion of it. PG&E's facilities are to be incorporated within <br /> any CEQA document. PG&E needs to verify that the CEQA document will identify any <br /> required future PG&E services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size,scope,and location of the project and as It relates to any rearrangement or new <br /> installation of PG&E facilities. <br /> Any proposed uses within the PG&E fee strip and/or easement,may include a California Public <br /> Utility Commission(CPUC)Section 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement.PG&E will advise if the <br /> necessity to incorporate a CPUC Section B51filing is required. <br /> This letter does not constitute PG&E`s conserrt to use any portion of its easement for any <br /> purpose not previously conveyed. PG&E will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PG&E Gas and Electric Facilities _ Pare <br /> Planning Commission Staff Report, Item # 1 02/06/2020 — PA-1800316 (UP) 16 <br /> Response Letters <br />