Laserfiche WebLink
=1. Construct a water well under permit and inspection of the Environmental <br /> Health Division prior to occupancy. Should the number of non-resident <br /> r individuals exceed 24 for at least 60 days per year, or the number of <br /> service connections exceed four, a yearly permit to operate a public water <br /> system ander the provisions of Title 22, CCR, will be required by the <br /> Environmental Health Division and San Joaquin County Development <br /> Title Section 9-1120.2 and 9-1115.9. The existing well is not constructed <br /> to Environmental Health Division standards to provide potable crater to <br /> system users. <br /> 5. The existing water well shall be properly destroyed. An environmental <br /> Health Division permit and inspection are required. <br /> E , <br />