Laserfiche WebLink
1 <br /> F 5.3 Description of soil lithology as noted from test pit by appropriate professional using <br /> industry standard protocol: The soil in this area is classified as Archerdale Clay Loam and 3� <br /> Cogna Loam as stated in the Soil Survey of San Joaquin County, California as provided by the <br /> United States Department of Agriculture, Soil Conservation Service. <br /> 5.4 Discussion of soil lithology as related to future onsite septic uses: The soil in this area is <br /> classified as Archerdale Loam and Cogna Loam as stated in the Soil Survey of San Joaquin County, / <br /> California as provided by the United States Department of Agriculture, Soil Conservation Service. <br /> The Archerdale Loam and Cogna Loam have a moderate permeability thus the percolation rate was <br /> 36-50 min/inch. Any future onsite septic system would perform adequately. (See Appendix). <br /> 6.0 PERCOLATION TEST INFORMATION SECTION <br /> 6.1 Site Map Showing the location,with concise and accurate dimensions of the percolation /� ! <br /> �y test holes on the parcel: See Appendix. 4 J <br /> 6.2 The Minimum Number of Shallow and Deep Percolation Tests was Performed for Each <br /> Parcel: Three shallow percolation test holes were prepared on the three proposed parcels. <br /> 6.3 Description of the Date, Time and Protocol Used to Prepare the Test Hole,Including <br /> Depth and Dimensions of Hole,Preparation of Hole, and Depth of Water Used to Presoak <br /> (Minimum 12 Inches): The shallow test hole was excavated to a depth of 42 inches and <br /> 5 inches in diameter and backfilled with 2 inches of"pea gravel" in accordance with County <br /> Standards. The shallow holes were prepared by Mike Toy on September 28, 2010 at 7:00 a.m. <br /> On September 29, 2010 at 7:30 a.m. the 24 hour presoak period was started. The holes were filled <br /> with 12 inches of water over the gravel at this time. - <br /> l ; <br /> 6.4 Description of the Date,Time and Condition of the Test Hole After the 24-Hour Soak <br /> Period (Hole Still Intact,Hole Dry,Depth to Water Remaining in Hole,Etc.): On <br /> t y September 30, 2010 at 5:00 a.m. the shallow test holes were dry. Six inches of water was added <br /> to each hole and the holes were deemed suitable to continue. The shallow test passed the minimum <br /> County requirements. <br /> 6.5 The Test Conformed to San Joaquin County Policy EHD 02-02 (Correct Depth,diameter, <br /> �k 211. gravel,6" Water Refill, Correct Readings Recorded): The percolation test conformed to <br /> San Joaquin County Policy EHD 02-02. <br /> i <br /> 6.6 Complete Percolation Test Form (Including Readings)Was Provided With REHS <br /> I <br /> Verification Signature. The Rate Was Correctly Calculated Using the Last Reading: <br /> See Appendix for Test Result Form. <br /> ' • TEST HOLE PERCOLATION RATE <br /> 1 (Parcel 1) 36 MIN./In. ; <br /> 2 (Parcel 2) 42 Min./In. <br /> 3 (Designated Remainder) 50 Min./In. <br /> *See Results in Appendix. <br /> 3 <br /> Y:IDMD0C120I0\I0391S0IL SUITABILITY STUDY 100110.doc <br />