Laserfiche WebLink
standards. All connections, repairs, or additions must be conducted under permit <br /> and inspection by the EHD. <br /> 4) The facility site plan does not provide average daily flow volumes generated by <br /> -jbh-. the number of customers and employees onsite. The facility site plan does not <br /> discuss if the existing septic system will be sufficient for these volumes. Provide <br /> average daily flow volumes and evaluate if existing septic system will be <br /> sufficient for the facility. <br /> 5) The facility site plan does not provide information on the operating methods to be <br /> Jused to determine characteristics of the wastes generated and the disposal options <br /> T to be used. It is the responsibility of the generator to determine the characteristics <br /> of the wastes and to determine proper disposal options. Provide information on <br /> the operating methods to be used to determine disposal options. <br /> 6) Pvide specifications for the following components: <br /> 7a. Oil water separator unit specifications <br /> � b. Sump pump specifications <br /> c. Laundry machine specifications <br /> If you should have any questions, please call Ted Tasiopoulos, Sr. REHS, of my staff at <br /> (209) 953-7698. <br /> Donna Heran, Director, REHS <br /> Environmental Health Department <br /> Rodney Estrada, Program Coordinator, REHS <br /> Environmental Health Denartment <br />