My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008716
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EUNICE
>
25414
>
2600 - Land Use Program
>
PA-1100059
>
SU0008716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:38 AM
Creation date
9/4/2019 6:10:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008716
PE
2625
FACILITY_NAME
PA-1100059
STREET_NUMBER
25414
Direction
N
STREET_NAME
EUNICE
STREET_TYPE
AVE
City
ACAMPO
APN
00513011
ENTERED_DATE
4/18/2011 12:00:00 AM
SITE_LOCATION
25414 N EUNICE AVE
RECEIVED_DATE
4/18/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\APPL.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\CDD OK.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\EH COND.PDF \MIGRATIONS\E\EUNICE\25414\PA-1100059\SU0008716\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The application has been tentatively scheduled for the Planning Commission meeting on <br /> June 2, 2011. The Community Development Department has reviewed the project and <br /> responses from other agencies and, providing any outstanding issues have been <br /> resolved regarding the lattice-type construction and proposed hight, will be <br /> recommending that the Planning Commission approve the Use Permit application <br /> subject to the following conditions of approval: <br /> Use Permit Application No. PA-1100059 was approved by the Planning Commission <br /> on . The effective date of approval is . This approval will expire on , which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval <br /> have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Rick Griffin, [2091468- <br /> 3154) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT". The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit <br /> application. A fee is required for the Site Plan review. (Development Title Section <br /> 9-884) <br /> b) APPROVED USE: Tris approval is for 149-foot tall radio communications tower as <br /> shown on the Site Plan dated April 11, 2011 (Use Type: Communication Services: <br /> Type 11). <br /> c) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. <br /> If the Capital Facility Fee is applicable, the County shall collect the fees before the <br /> issuance of any building permits. (Development Title Section 9-1245.2) <br /> d) SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment shelter shall be set back a <br /> minimum of ten feet from the side property fine and fifteen feet from the rear <br /> property line. (Development Title Section 9-310.5) <br /> (2) New freestanding support structures shall be located a distance equal to at least <br /> the height of the said structure from residential structures on adjoining <br /> properties. (Development Title Section 9-1065.4[d]) <br /> e) MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and <br /> supporting equipment associated with wireless telecommunication shall be <br /> :1t() ? Pry-I M00 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.