Laserfiche WebLink
Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> C PA-08-48 (UP) <br /> h <br /> 4. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met the <br /> i requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 5. Dischargers whose projects disturb 1 or more acres of soil or whose projects disturb less than 1 acre but are <br /> part of a larger common plan of development that in total disturbs I or more acres, are required to obtain <br /> coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity <br /> Construction General Permit 99-08-DWQ). Construction activity subject to this permit includes clearing, <br /> grading and disturbances to the ground such as stockpiling, or excavation,but does not include regular <br /> maintenance activities performed to restore the original line, grade, or capacity of the facility. <br /> 6. The proposed expansion will increase the amount of runoff as a result of increasing the impervious surface <br /> area. Therefore,the capacity of the existing retention pond shall be inereased,to accommodate the <br /> additional runoff generated as a result of the proposed project. Required retention pond capacity shall be <br /> calculated by a registered civil engineer, licensed contractor or an architect prior to release of building <br /> permit. <br /> 7. Applicant shall provide a written statement to the Department of Public Works stating whether or not <br /> Surface Transportation Assistance Act(STAA)type trucks will be used as a part of the.proposed operation. <br /> If STAA type trucks are to be used, the driveways serving the site off of State Route 88 shall be designed <br /> and improved using a template to meet the turning radius of STAA trucks. <br /> BD:SS:av <br /> \\sjpwgov.org\shares\DevServices\DPubservlCOMMENTS\UP\YR 20081PA-0800048.doc •+ <br />