Laserfiche WebLink
NEIL'O.ANDERSON&ASSOCIATES, INC. <br /> P0 GEOI'ECWCAL•ENVIRONMENTAL•GROUNDWATER-INSPECTIONS•TESTING•LABORATORY.SERVICES <br /> Dy SACRAME1a OFFICE, CORPORATE OFFICE <br /> Z w 4221 Nor thgate Boulevard,Suite 6 22 Houston Lane <br /> G crnro (510)s9t-6304 Sacramento;Califoznia 95834 Lodi,California 95240 <br /> p STOCKTON.(209)472-109V (916)929-9267 (209)367-3701 <br /> 9SSA.G� . eiaNcxacoRnovn (916)63.14455 FAX:_(916)929-9269, FAX:(209)333-8303 <br /> October 4,2001 <br /> ` SOIL SUITABILITY/NITRATE LOADING STUDY <br /> OMEGA.WINERY` . <br /> 13731 N.HIGHWAY.88 AT'BLARNEY LANE ; <br />. LODI,'CALIFORNIA <br /> OUR TOB NUMBER:'LG00-287 ; <br /> I.^ INTRODUCTION <br /> Our office was contracted by,W. Mike Smith-of Mike.Smith Engineering,�,Lodi, CA to <br /> conduct a soil suitability/nitrate loading study for the proposed boutique'winery located at 13731 <br /> Higliway'88;Lodi, CA-(Plate 1). Nlike Smith Engineering is performing the civil.engineering <br /> :for the-project. <br /> The soil suitability/nitrate loading study was conducted to determine if the`soils are <br /> suitable for the.use of a septic system.and to estimate'whether the proposed project will impact- <br /> ground-water quality. The study was performed according to the requirements of Section 9- <br /> 410.5.2(d) <br /> 1105.2(d)'of the San Joaquin County Development.,'Major elements of the field work included <br /> drilling several borings_and conducting percolation tests in-the-more favorable conditions. These - <br /> tests'are required by San:Joaquin County,Public Health Services Environmental Health Division <br /> (SJC PHS-EHD) for project approval. <br /> n addition to conducting the fieldwork; are view of published soil information, geologic <br /> k maps, and available ground water information was reviewed to determine the suitability of soils. <br /> Due to San'Joaquin County Public Health Services;,SJC PHS-EHD's concern of nitrate <br /> n contamination of shallow ground water in the area,;a nitrate loading balance was a requirement <br /> for project approval. The nitrate loading study Was-conducted to estimate the potential impact of . <br /> leachin nitrates from the septic syst <br /> study. em'into'groundwater. ,This.report presents the results'of our <br /> g <br />