My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005292
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14400
>
2600 - Land Use Program
>
PA-0500509
>
SU0005292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:12 AM
Creation date
9/4/2019 6:12:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005292
PE
2611
FACILITY_NAME
PA-0500509
STREET_NUMBER
14400
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
APN
01911026, 20, &
ENTERED_DATE
8/11/2005 12:00:00 AM
SITE_LOCATION
14400 E HWY 88
RECEIVED_DATE
8/9/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14400\PA-0500509\SU0005292\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
too <br /> Raymond Hoo -4- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-05-509(SU) and PA-05-844 (ZR) <br /> 19. The applicant/developer shall acquire and dedicate to the County,the necessary right-of-way to <br /> accomodate the sixty(60) foot collector roadway along the south property line connecting Sierra Drive to <br /> Tully Road prior to a roval of the Final Mgp, as detailed in the agreement between Lockeford Land <br /> Group LLC and Kautz Row Crop Farms. <br /> 20. The roadwa connecting Sierra Drive to Tully Road shall be im roved to Countv Standards for a six <br /> 60 foot ri2ht-of-way collector roadwa . <br /> 23. A traffic sigLial shall be installed at the intersection of State Highway Route 12/88 and Sierra Drive. <br /> 22. Left-turn lanes, as detailed in the final Traffic Study(50 MPH Design) shall be installed on the <br /> eastbound and westbound State Hiv-hwgy Route 12/88 at State Highway Route and Sierra Drive access <br /> intersection. <br /> 23. A deceleration right-turn lane as detailed in the final Traffic Stud 50 MPH Desi shall be installed <br /> on the eastbound State Hi hwaute 12/88 at State High waoute 12/88 and Sierra Drive access <br /> intersection. <br /> 24. A raised median shall be installed at the State Highw4y HighwayRoute 12/88 and east access intersection to allow <br /> for right-turn-in and right-turn out movements only. The median shall be designed such that the Mira <br /> Vista lane connection on the north side of State Highwgy HighwayRoute 12/88 at this intersection will have left- <br /> turn access to and from the highway. <br /> 25. Theapplicant/developer shall pay fair share contribution for the future signalization of State Highway <br /> Route 12/88 and Brandt Road. The fair share amount shall be_$16 750 and shall be paid prior to approval <br /> of Final Mat). <br /> 26. A State of California Storm Water Drainage Permit shall be obtained If required,prior to approval of the <br /> Improvement Plans. <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> In Rural Residenti,al roadway A.e. dike shall be prohibited and the shouldet widiii shall be 6-6--et wide. <br /> MRC:SH:av <br /> PACOMMENTSISUVYR 2005WA-0500509&PA-0500844(revisiW)_wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.