My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003220
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18625
>
2600 - Land Use Program
>
SA-92-02
>
SU0003220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:07 AM
Creation date
9/4/2019 6:19:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003220
PE
2633
FACILITY_NAME
SA-92-02
STREET_NUMBER
18625
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
18625 E HWY 88
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18625\SA-92-02\SU0003220\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 J <br /> r SAN JOAQUIN VALLEY UNIFIED <br /> AIR POLLUTION CONTROL DISTRICT <br /> SAN JOAQUIN COUNTY ZONE <br /> Suggested Mitigation Measures <br /> A. Emissions generated during the construction process are of <br /> concern to the District. The following dust control <br /> practices should be implemented: <br /> 1) All material excavated or graded should be sufficiently <br /> watered to prevent excessive amount of dust. Watering <br /> should occur at least twice a day with complete coverage, <br /> preferably in the late morning and after work is done for <br /> the day. <br /> 2) All clearing, grading earth moving or excavation activities <br /> shall cease during periods of high winds greater than 20 <br /> mph average over one hour. <br /> 3) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amount of dust. <br /> 4 ) The area disturbed by clearing, earth moving or excavation <br /> activities should be minimized at all times. <br /> 5) The developer, should mow instead of disking for weed <br /> control , thereby leaving the ground undisturbed and with <br /> a mulch covering. <br /> B. After clearing, grading, earth moving, or excavation operation, <br /> fugitive dust emissions during construction phase should ;be <br /> - controlled by the following methods : <br /> 1) All inactive portions of the construction site should be <br /> seeded and watered until grass growth is evident. <br /> 2) All active portions of the site shall -be sufficiently <br /> watered to prevent excessive amount of dust. <br /> C. At all times, fugitive dust emissions should be controlled <br /> using the following procedures: <br /> 1) On-site vehicle speed shall be limited to 15 mph. <br /> 2) . All area with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions. <br /> 3) Use of petroleum-based dust palliative shall meet the road <br /> oil requirements of the District' s Rules 409 . 5 Cutback <br /> Asphalt Paving Materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.