Laserfiche WebLink
SJVUAPCD <br /> SJCZ <br /> Mitigation Measures <br /> page 2 <br /> 4) Streets adjacent to the project site should , be swept as <br /> needed to remove silt which may have accumulated from <br /> construction activities. <br /> D. At all times, ozone precursor emissions should be controlled <br /> by the following methods: <br /> 1) All internal combustion engine driven. equipment should be <br /> properly maintained and well tuned according to <br /> manufacturer's specifications. <br /> 2) During the smog season (May through October) , the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time. <br /> i <br />