My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003049
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2600 - Land Use Program
>
SA-94-24
>
SU0003049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:07 AM
Creation date
9/4/2019 6:20:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003049
PE
2633
FACILITY_NAME
SA-94-24
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
18662 N HWY 88
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18662\SA-94-24\SU0003049\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPMENTS <br /> SA-94-24 <br /> RECOMMENDATIONS: <br /> 1. Improvements, restrictions, and permits shall be as required <br /> by Caltrans for State Highway 12 & 88 . <br /> (Development Title Section 9-860. 4) <br /> 2 . A Traffic Study is required to determine the impacts and <br /> Mitigations for the intersections and roadways in the vicinity <br /> and to determine the trip generation from this development. <br /> All mitigations required by the Traffic Study shall be made by <br /> the applicant. The developer shall deposit funds with the <br /> County for all costs, as estimated by the Public Works <br /> Department Public Facilities Division, prior to Public Works <br /> Department preparing or contracting for the required study. <br /> (Development Title Section 9-1150. 4) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. The fee currently is $3 , 692 . 00 <br /> per 1, 000 gross square foot of building as Retail Service, and <br /> $164 . 07 per daily trip-end generated in the Lockeford area. <br /> The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. <br /> (Resolution R-90-304 , R-91-1025, R-93-167, R-94-174) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.