Laserfiche WebLink
Ernie Schenone,Jr. <br /> August 19,2003 <br /> Schenone Specialty Foods,Inc. Page 2 <br /> ➢ A report containing results of the soil suitability and nitrate loading studies,percolation test <br /> findings and design of an on-site wastewater disposal system(septic system)was submitted to the <br /> EHD by Chesney Consulting on January 22, 2003. Based on the site soil characteristics, <br /> proposed business operations and analysis of wastewater obtained from your present business <br /> location,the septic system was designed to accommodate an average of 12 employees(7 to 25 at <br /> current facility)and 25 customers(10 to 40 anticipated)per day. The report stated that foods and <br /> food by-products used in the chocolate making process "will not be introduced into the septic <br /> system"and will be handled as solid waste and disposed of in a dumpster. "...The wastewater <br /> flow will be predominantly blackwater from toilets, with a comparatively small volume of <br /> graywater from sinks, or other sources of graywoter. Additional wastewater constituents may <br /> consist of coffee,juices or other similar type liquids..." The designed septic system called for a . <br /> grease trap; primary one-compartment septic tank; secondary dual-compartment septic tank with <br /> dual pump vault,alarm and effluent filters; a 1,800 sq. ft. filter bed and two 40-ft.leach lines with <br /> two 36 in.diameter seepage pits 4 The report also recommended a reserve disposal field area <br /> totaling 10,500 sq. ft. (3,500 sq. ft. for 100%replacement of initial system; 3,500 sq. ft. for a <br /> future building proposed for future production expansion with a 3,500 sq. ft. replacement area). <br /> The report"Conclusions and Recommendations" stressed that ... "water usage be kept to an <br /> absolute minimum"and ... "water usage accounting will be important."s <br /> ➢ In a letter to the CVRWQCB,dated March 1, 2003,Chesney Consulting submitted inform tion <br /> requested in that agency's October 21, 2002, letter,along with a wastewater discharge permit fee <br /> of$400.00. <br /> On March 5,2003,EHD staff began review of the soil suitability and nitrate loading studies <br /> submitted by Chesney Consulting. <br /> On April 15,2003,approval of the plot plan for your project was requested at the EHD public <br /> counter. The plot plan presented was for a new 19,826 sq. ft.building,a 1,600 sq. ft. filter bed, <br /> and septic tanks located in the access area north of the building. The new building size <br /> represented a 57.3%increase in the size over the original 12,600 sq. ft. building described in the <br /> site approval application. The plot plan also showed two additional restrooms and a private <br /> restroom with shower on the second floor. The equipment shown included two water-cooled <br /> tables in the production area. The.EHD approved the plot plan for"Plan Check Only"which <br /> allowed the CDD to begin their plan check process prior to issuance of building permits. <br /> On April 17 and April 22, 2003,the EHD received telefaxed copies of correspondence from you <br /> to Tim O'Brien at the CVRWQCB concerning wastewater flow associated with the production <br /> portion of your operation. You proposed to discharge water from the water-cooled tables to the <br /> storm drain and reiterated that The chocolate <br /> manufacturing area uses virtually <br /> no water"with <br /> "only occasional washing of molds and hand tools in that area.' . <br /> ➢ On April 29,2003,your telefaxed letter was received requesting confirmation that the EHD Site <br /> Approval conditions had been met so grading and building permits could be issued by the CDD. <br /> In this letter,you also commented on verbal discussions between you and my staff,and the <br /> additional information requested by the EHD following review of the plot plan submitted on <br /> April 15`x. <br /> ➢ In a letter dated April 30,2003, the EHD approved the Nitrate Loading Study submitted by <br /> Chesney Consulting with six conditions listed. Condition#I specified that, prior to EHD <br /> approval for the issuance of grading permits,an enlarged drawing to scale of the proposed <br /> °See Attachment 4: Preliminary Septic System design submitted by Chesney Consulting. <br /> 5 See Attachment 5: Nitrate Loading Study, Soil Suitability Study,Septic System Desi n,December 31,2002, <br /> Chesney Consulting,p. 13. <br /> 6 See Attachment 6: Memo from Chocoholics to CVRWQCB,dated April 15,2001 <br />