Laserfiche WebLink
a <br /> Sent By: RWOC8 SACRAMENTO; gib 255 3015; Aug- 3 18:10; Page 414 <br /> ti' eiy: <br /> ADDITIONAL iNFORmATION REQUIREMENTS <br /> CHOCOLATE MANUACTURI'NG FACILITY <br /> CLIIMENTS,SA IV JOAQUIN COUNTY <br /> Please provide the following information in a report prepared by a California Registered <br /> Engineer: <br /> 1. Describe the facility,the items that will be available for purchase,the anticipated number <br /> of customers, and days of operation. <br /> 2, Describe the products that will be manufactured and the waste materials associated with <br /> each product. Describe how off-specification, spoiled, or cont2!minated materials will be <br /> disposed. <br /> 3. Describe cleaning procedures, equipment, and chemicals that will be used in sanitation <br /> activities for the food processing. <br /> 4. Describe all sources of wastewater(domestic and industrial including filing water)and <br /> estimatz the Flow rates. Provide estimates of wastewater quality based on samples of ' <br /> similar operations or published data. Provide a chemical cbaraeterixation of the <br /> wastewater and cooling water quality,including biochemical oxygen cletnand,total <br /> suspended solids.total dissolved solids,nitrogenous compounds,and volatile organic.' <br /> chemicals. <br /> 5. Provide loading rate calculations for the process wastewater septic tank and Ocamibe how <br /> the treatment is adequate to protect groundwater quality from degradation. Because the <br /> facility is proposing to discharge chocolate manufacturing wastewater to the septic tank, <br /> additional treatment will be required. If appropriate,provide a description of the revised <br /> pretivatment system and septic tankileach linelseepage pit construction and an explanation <br /> of how the wastewater disposal is protective of groundwater quality. <br /> 5. Describe procedures that will be implemented to prevent the discharge oEfatsloildlgFeme <br />` to the Icachfield. Describe how odors arising from an overloaded septic tank or leach field <br /> will be prevented. <br /> 7. Describe how cooling water will be disposed of. If surface impoundments will be used to <br /> store wastewater,provide diagn=and a description of the planned impoundment, <br /> ftxcaiion,size and depth,construction materials,inlet and outlets,depth to growadwater <br /> below the bottom of the pond,and existing or planned groundwater monitoring wells. <br /> S. Allowing for two feet of freeboard,what is the approximate storage capacity of the <br /> wastewater pond(s)7 Provide a water balance that evaluates the containment suueba <br /> ability to provide sufficient capacity on a month-by-month basis. Include monthly <br /> evaporation,precipitation,and irrigation rates as well aS monthly discharge volumes. <br /> Rainfall shall be based on the 100-year return period total annual prcciOtation. <br /> 9. Describe management provisions that will be implemented to pruvcut the occuffence of <br /> flies,mosquitoes,odor nuisances,and problems warn as pond overflows(maiaite>aaYtoe <br /> plans,standby pumps or generators,and contingency plans.etc.). <br /> ria.a�.riw�nsror�pvis�.aeaMo����� <br />