Laserfiche WebLink
Thomas M. Gau <br /> COMMENTS ON DEVELOPMENT <br /> 1 DV-98-2/SA-98-18 <br /> SA-98-18 <br /> ;. I• The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $159.10 per additional <br /> daily trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> ] 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $364.00 per <br /> additional 1,000 gross square foot of building as Retail Service. The fee shall be automatically <br /> increased'on January I of each year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. Sewage shall be limited to 1,600 gallons/acre/day and restriction of flows shall be verified by a <br /> Registered Civil Engineer or Architect. <br /> 4. Any dedications, improvements, or permits for State Highway Route 88 shall be as required by <br /> Caltrans. <br /> R 5. Provide proof that Caltrans will accept any additional run off into their system. <br /> 6. A copy of the improvement Plan shall be submitted prior to release of building permit. <br /> Note: Increases in traffic on State Highway Route 88 may trigger restrictions of ingress and egress to <br /> site in the near future. <br /> GK:R":gn <br /> P5413152.G2 <br /> F <br /> E: Manuel Lopez, Deputy Director/Development <br /> f <br />