Laserfiche WebLink
'} Y <br /> 4. Construction of individual sewage disposal system(s) under permit and <br /> inspection by the Environmental Health Division is required at the time of <br /> development (San Joaquin County Development Title Section 9-1110.3 & <br /> 9-1110.4). <br /> 5. Construct a water well under permit and inspection of the Environmental <br /> Health Division prior to occupancy. Should the number of non-resident <br /> individuals exceed 24 for at least 60 days per year, or the number of service <br /> connections exceed four, a yearly permit to operate a public water system <br /> under the provisions of Title 22, CCR, will be required by the <br /> Environmental Health Division and San Joaquin County Development Title <br /> Section 9-1120.2 and 9-1115.9. <br /> I <br /> i <br /> i <br /> l <br />