Laserfiche WebLink
� 1 <br /> 0 <br /> oulro <br /> oQ.co <br /> % P.O.BOX 1810-1810 E.HAZELTON AVENUE ' <br /> THOMAS M.GAU ��y <br /> �Lw� ,-•- /y STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(209)468-2999 i <br /> ..P w .sjgov.org/pubworks <br /> FRITZ <br /> BUCHMAN - - <br /> wp7 rhnngfferYOWL) RECENED <br /> DEPUTY DIRECTOR - qq <br /> MICHAEL SELLING ,i DEC L (© ?n <br /> j 1 <br /> DEPUTY DIRECTOR - <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR ,i Community Development Dept, <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR - <br /> III <br /> December 20,2011' <br /> i <br /> MEMORANDUM <br /> TO: John L.Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Alex Chetley,Engineer V <br /> Public Services Division. <br /> SUBJECT: PA-1100197; A Minor Subdivision application to subdivide an existing 400-acre parcel into ten <br /> 40-acre parcels. The applicant has applied for a Parcel Map Waiver. The project site is located <br /> one-half mile south of the easterly terminus of Frazier Road, northeast of Linden. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Kurt A. Kautz APPLICANT: Quartaroli&Associates <br /> ADDRESS: 22000 E. Frazier Road, Linden APN: 065-230-03; 065-240-08, 09, 10& 11 <br /> INFORMATION: <br /> I <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard.- <br /> Frazier <br /> azard.Frazier Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. I , <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />