Laserfiche WebLink
t <br /> r � P.O.BOX 1810-1810 E.HAZEL70N AVENUE <br /> THOMAS R. FLINN S; STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> DIRECTOR www.sjgov.orglpubworks <br /> 4CiFOA:+ <br /> THOMAS W GAU <br /> CHIEF DEPUTY DIRECTOR n <br /> MICHAEL SELLING � e YOU RECEIVED <br /> DEPUTY DIRECTOR c� <br /> STEVEN WINKLER S E P 2 d 2010 <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> Community Development D <br /> BUSINESS ADMINISTRATOR BS, <br /> September 22,2010 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley,Engineer V AC/ <br /> Public Services Division <br /> SUBJECT: PA-1000187; A Minor Subdivision application including lot line adjustment to result in three <br /> parcels and a remainder parcel. Parcel 1 (a home-site parcel)to contain 5 acres,Parcel 2 to <br /> contain 72 acres, Parcel 3 (a home-site parcel)to contain 5 acres and the remainder parcel to <br /> contain 149 acres; located on the north and south sides of the north channel of the Calaveras <br /> River approximately 650 feet northwest of the northerly terminus of Podesta Lane (a private <br /> road),northeast of Linden(Supervisorial District 4) <br /> PROPERTY OWNER: Frederick Podesta APPLICANT: Dillon &Murphy <br /> ADDRESS: 22650 E. Frazier Road, Linden APN: 067-080-01 & 03; 065-240-04; <br /> 091-330-08; 091-350-01 <br /> INFORMATION: <br /> Portions of the site within the north channel of the Calaveras River are currently located within a Federal Flood <br /> Insurance Administration Designated Flood Hazard Area designated as Zone AE. The 100-year Flood Elevation <br /> will be approximately 117 to 119 feet NAVD 1988 <br /> Frazier Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required wben parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br />