Laserfiche WebLink
a ' <br /> FM. <br /> Thomas M. Gau <br /> -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-99-82 <br /> The estimate shall be prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Department option, the Department of <br /> Public Works will prepare the drawing and estimate for an additional fee of$115.00. <br /> (City of Stockton) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1,171.00 per <br /> 1,000 gross square foot of building as service commercial for Phase I and $3,780.00 per <br /> 1,000 gross square foot of building as retail service for Phase ll, or $167.96 per daily <br /> trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering <br /> ment <br /> an be verified that the existing development <br /> News Record. A credit may be allowed if it c <br /> on this site was in operation on or after April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 5. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently is <br /> $393.00 per 1,000 gross square foot of building as retail service/service commercial. <br /> The fee shall be automatically increased on January 1 of each year through the year i <br /> 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> I <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. The City of Stockton shall verify that the appropriate Right of Service Units for sanitary <br /> sewer have been paid for the proposed development prior to approval of the <br /> Improvement Plan. (Parcel is assessed for 1.0 ROSU) <br /> GK:RH:af <br /> PS-WIV AIE <br /> E: Manuel Lopez, Deputy Director/Development <br /> I <br /> i <br /> I <br /> { I <br /> I <br /> P I <br /> if <br /> i <br /> I <br /> 1 <br /> w <br /> I <br /> i <br /> I <br />