My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004542
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2201
>
2600 - Land Use Program
>
PA-0200317
>
SU0004542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:52 AM
Creation date
9/4/2019 6:41:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004542
FACILITY_NAME
PA-0200317
STREET_NUMBER
2201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
ENTERED_DATE
7/13/2004 12:00:00 AM
SITE_LOCATION
2201 E FRENCH CAMP RD
RECEIVED_DATE
7/31/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\2201\PA-0200317\SU0004542\APPL.PDF \MIGRATIONS\F\FRENCH CAMP\2201\PA-0200317\SU0004542\CDD OK.PDF \MIGRATIONS\F\FRENCH CAMP\2201\PA-0200317\SU0004542\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Borges reviewed Environmental Health Department's requirements. <br /> 11:00 a.m. 5. MAJOR SUBDIVISION APPLICATION NO. PA-0200027 <br /> JJ (C/O FOOTHILL ENGINEERING). A Major Subdivision application <br /> to subdivide 42 acres into 17residential lots of approximately 2 <br /> acres each. The subdivision will be referred to as "Schulz Estates". <br /> Located on the northwest corner of Woodson Road and State <br /> Route 99 West Frontage Road, north of Lodi (005-160-28; Address: <br /> 4200 East Woodson Road, Acampo). <br /> Jennifer Jolley, Associate Planner; Ervin Rifenburg; Foothill Engineering and Robert <br /> Schulz of Schulz Brothers Inc. were present for this item. <br /> Ms. Jolley introduced the project. <br /> Mr. Rifenburg indicated on the map where and how he would like the masonry wall <br /> installed. Mr. Rifenburg also indicated that the wall would have to be constructed on an <br /> individual basis. The location of the wall will depend on the location of the house on the <br /> lot. <br /> Mr. Rifenburg indicated that the applicants have chosen to provide the water supply for <br /> agriculture for the Loss of Agricultural Land mitigation measure. <br /> Mr. Karam reviewed the Public Works Department requirements. <br /> Ms. Jolley indicated that secondary access will need to be shown on the site plan. <br /> Mr. Borges reviewed Environmental Health Department requirements. <br /> Ms. Jolley indicated that the Planning Commission is tentatively scheduled for <br /> September 19, 2002. <br /> Ms. Jolley suggest that Mr. Rifenburg contact Mr. Dalton regarding the Fire Code <br /> requirements. <br /> The meeting was adjourned at 11:35 a.m. <br /> THE DEVELOPMENT COMMITTEE CHANDLER MARTIN <br /> CHAIRMAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.