My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2467
>
2600 - Land Use Program
>
SA-95-20
>
SU0002983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:35 AM
Creation date
9/4/2019 6:41:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002983
PE
2633
FACILITY_NAME
SA-95-20
STREET_NUMBER
2467
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
2467 E FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\2467\SA-95-20\SU0002983\APPL.PDF \MIGRATIONS\F\FRENCH CAMP\2467\SA-95-20\SU0002983\CDD OK.PDF \MIGRATIONS\F\FRENCH CAMP\2467\SA-95-20\SU0002983\EH COND.PDF \MIGRATIONS\F\FRENCH CAMP\2467\SA-95-20\SU0002983\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-20 <br /> supplied by the Department of Public Works and submitted to the <br /> Department of Public Works for approval. As an option, the <br /> Department of Public Works will prepare the drawing and estimate <br /> for an additional fee of $115 .00 . ) <br /> (Development Title Section 9-1150 .2) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of building <br /> permit application. (The fee currently is $966 per 1, 000 gross <br /> square foot of building as Warehouse or $197. 91 per additional <br /> daily trip-end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167 and R-94-174) <br /> 4 . The Water Supply Facilities Impact Mitigation Fee will be required <br /> for this development. The fee is due and payable prior to <br /> issuance of the building permit. The fee currently is $116 per <br /> 1, 000 gross square foot of building as Warehouse . The fee shall <br /> be automatically increased on January 1 of each year through the <br /> year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818 .4 and Resolution R-91-327) <br /> 5 . Lot Line Adjustment Application LA-95-29 shall be complete prior <br /> to processing the Deferred Frontage and Roadway Improvement <br /> Agreement and issuance of the building permit . <br /> TMI :lt <br /> rs-saisc.ca <br /> E: Manuel Lopez, Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.