Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-57 <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. (Development Title Section 9-1145. 2) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently <br /> is $88 . 89 per 1, 000 gross square foot of building as <br /> "Warehouse" . The fee can be exempted if the building floor <br /> area addition is 200 square foot or less. The fee shall be <br /> automatically increased on January 1 of each year at the rate <br /> of 6.9 percent. An additional 3 .5 percent shall be added to <br /> the fee upon payment for processing and administering the <br /> program. (Resolution R-91-327) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />