My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011570
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2919
>
2600 - Land Use Program
>
PA-1700175
>
SU0011570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:16 AM
Creation date
9/4/2019 6:42:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011570
PE
2622
FACILITY_NAME
PA-1700175
STREET_NUMBER
2919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
STOCKTON
Zip
95336-
APN
17710005
ENTERED_DATE
11/9/2017 12:00:00 AM
SITE_LOCATION
2919 E FRENCH CAMP RD
RECEIVED_DATE
11/9/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\2919\PA-1700175\SU0011570\APPL.PDF \MIGRATIONS\F\FRENCH CAMP\2919\PA-1700175\SU0011570\CDD OK.PDF \MIGRATIONS\F\FRENCH CAMP\2919\PA-1700175\SU0011570\Surveyor Memo.pdf
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG, Inc . <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid For no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP Fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-heu of fres,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the rfMMs or issuance of a building permit,whichever occurs fust,the project applicant rmsst: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> a Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> • Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States(pursuant to Section 404 Clean Water Act], <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br /> days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed <br /> on the project site, the Corps and the Regional Water Quality Control Board (RWQCS) would have regulatory authority over those <br /> mapped areas[pursuant to Section 404 and 401 of the Clean Water Act respectively]and permits would be required from each of these <br /> resource agencies prior to grading the project site. <br /> If you have any questions, please call(209)235-0600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.