Laserfiche WebLink
31SJCOG, Inc . <br /> S JC0G, Inc. <br /> San Joagnia Coant l Alulti-Species Habitat Conservation dam'Open Space Plan <br /> 555 Fast Weber Avenue•Stockton,CA 95202 • (209)245-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Communitv Development Department, Planning Department, Building <br /> Department, Engineering Department, Survey Department,Transportation Department, <br /> Other: <br /> FROM: Laurel Boyd,SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take ivfn;m;ration Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If TRAM are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITM&. This is the effective date <br /> of the ITMMs. <br /> R y 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the rrmms. <br /> ° 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> - b. Pay the appropriate SJMSCP£ee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITRIMs or issuance of a building permit,whicbever occurs <br /> fast,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Gf p Y <br /> Project Title: PA-17700175(MS) <br /> Landowner: Joe Marchesotti Applicant: Dillon&Murphy <br /> } Assessor Parcel#s: 177-100-05 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: John Funderburg <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />