Laserfiche WebLink
Department of Public Works <br /> SANJ 0 A Q U I N Kris Balaji,Director of Public Works <br /> —COU N T Y i I Fritz Buchman,Deputy Directorroevelopment <br /> Greatness groes here, i=7 Michael Selling,Deputy DirectorlEngineenng <br /> -- wor3ms for YOU Jim Stone,Deputy DirectorlOperetions <br /> Najee Zarif,Interim Business Administrator <br /> November 11,2017 <br /> RECEIVED <br /> MEMORANDUM <br /> TO: Mo Hatef, Senior Planner <br /> San Joaquin aunty <br /> Community Development Department (✓()M 11 u n I <br /> ty CONTACT PERSON: John Funderburg L �Qpf11@Rt <br /> FROM: Alex Chetley,Engineering Services Manage <br /> Development Services Division <br /> SUBJECT: PA-1700175;A Minor Subdivision application to subdivide a 129 acre parcel into two <br /> parcels. Parcel One to contain 120 acres. Parcel Two to contain 9.0 acres. The parcels <br /> are being created under the provisions of Development Title Section 9-610.3,Parcels for <br /> Certain Specified Uses; located%:mile west of State Route 99 Highway, on the north <br /> side of East French Camp Road,French Camp. (Supervisorial District 1) <br /> PROPERTY OWNER: Joe Marchesotti APPLICANT: Dillon&Murphy <br /> PROPERTY ADDRESS: 2919 French Camp Road,Manteca APN: 177-100-05 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated Flood Hazard <br /> Area designated as Zone A,AO,AE and X(shaded). The 100-year Flood Elevation will be <br /> approximately 30-31 feet NAVD 1988. <br /> French Camp Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 <br /> feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee <br /> is due and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />