Laserfiche WebLink
District. <br /> h) Easements for all District facilities shall be dedicated on current District forms. Additional <br /> easements shall be dedicated for access to all manholes and control structures. All District <br /> easements shall be shown on the final map together with the District's standard acknowledgment. <br /> Easements for pipelines shall be a minimum of 30 ft. in width. A title report shall be provided to <br /> the District for its use in the preparation of all required documents to ascertain if the District has a <br /> fee interest with the proposed development. <br /> i) Improvement plans for both off-site and on-site improvements shall be submitted for review and <br /> approval by the District's Board of Directors. Prior to plan submittal, the developer shall submit a <br /> retainer for plan check and inspections required for the project in accordance with the current <br /> established fee schedule. <br /> j) Upon completion of the project, the developer shall provide one complete set of "As-Built" <br /> drawings to the District for its future use. <br /> k) The following statement shall be affixed or otherwise included within the approved development <br /> plans: "SSJID has adopted time limits limiting the period of its approval should the <br /> landowner/developer fail to substantially complete his development project in a timely manner <br /> and as per approved development plans. <br /> 1) These time limits adopted by SSJID are in most cases equal to those utilized by the <br /> governmental agency or institution responsible for development approvals. Should the time limit <br /> be exceeded, SSJID reserves the right to then apply any of its current development standards <br /> and requirements." <br /> m) The District reserves the right to apply additional conditions if development does not occur within <br /> one (1) year of the Planning Commission's approval. <br /> Conditions of Approval - 6 - PA-1100224 <br />