Laserfiche WebLink
2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Trueman Phillips, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development <br /> Title Section 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is$168.96 per daily trip-end <br /> generated in the Lathrop area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution <br /> R-00-433) <br /> d. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> e. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> f. The applicant shall obtain a Storm Water Pollution Prevention Plan permit from the State Water <br /> Resources Control Board prior to the beginning of any construction. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil <br /> shall require a State NPDES construction permit. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Linda Turkatte, 468-3441) <br /> a. The number of animals per acre shall be consistent with appropriate waste management <br /> practices. A manure management plan shall be submitted for approval to the Environmental <br /> Health Department. A review fee of$186.00 is applicable at the time of submittal. Compliance <br /> with San Joaquin County Development Title 5 and the California Code of Regulations, Title 23, <br /> Division 3, Chapter 15, Article 6, shall be addressed in the manure management plan. <br /> b. Construction of individual sewage disposal systems under permit and inspection by the <br /> Environmental Health Department is required at the time of development. (Development Title <br /> Sections 9-1110.3 and 9-1110.4) <br /> NOTE: The Environmental Health Department believes a bathroom facility is needed for the <br /> proposed client and event use. The Environmental Health Department will allow chemical <br /> toilets for interim use for up to 18 months. <br /> c. Prior to final occupancy, destroy any abandoned wells under permit and inspection by the <br /> Environmental Health Department, or bring the well into service with a proper seal (i.e., windmill <br /> use would be acceptable). (Development Title Section 9-1115.5[e]) <br /> Conditions of Approval -3 - PA-03-565 <br />