Laserfiche WebLink
Development Committee -3- <br /> UP-94-14 <br /> h. Submit an Improvement Plan, prepared by a registered <br /> civil engineer, showing drainage, driveway access <br /> details, on-site parking, landscaping, signs, driveway <br /> gates, existing and proposed utility services, and <br /> grading. Additional storm drainage run-off created by <br /> new improvements shall be retained on-site. The <br /> drainage pattern and corresponding storm drain <br /> improvements shall be shown on the Improvement Plan. A <br /> plan check fee will be required. (Development Title <br /> Section 9-884) <br /> CM:ss <br /> c: Richard Stagno <br /> Hayres Egg Farms <br />