Summer: Volume=30,000 gal/d(6.1 days)(1 fe/7.48 gal) <br /> =24,465 fe <br /> Surface area= (24,465 06 ft)(1 ac/43,560 ft ) = 0.10 acres <br /> Therefore, winter condition requirement of 0.22 acres control surface area design. <br /> SE. Surface loading: lb BODS/acreod = (0.03 Mgal/day)(550 mg/1)-(0.25 acres)X <br /> [(8.34 lb/Mgalo(mg/1)] = 550 lbs BODS acreoday <br /> Therefore, increase pond surface area to 0.5 acres to reduce BODS acreoday to 275 lbs. <br /> E. FACULTATIVE TREATMENT POND STORAGE VOLUME <br /> Volume (ft3)= (LWxLLxLD)-[(SxLD2)(LW+LL)]+(4xS2xLD3-3) <br /> ft3= (150ftx 150ftx6ft) - [(2x62)x (150ft+ 150ft) + (4x22 x63-3)= <br /> fe = 135,000 - 21,600+ 1152 = 114,552 fe <br /> Gals = 114,552 ft x 7.48 gaIV = 856,850 gallons <br /> rainfall =(22,500 ft2)(9.6 in total rainfall)(7.48 gal/ft ) - 12 in/ft) = 134,600 gals <br /> evaporation=(0.05 in/day)(120 days)(22,500 ft2)(7.48 gallft3) - 12 in/ft= 84,150 gals <br /> Net Gain= 50,450 gals -4 months =+12,600 gal/month during winter months. <br /> Entire Facility is in Zone B - 500 year Flood Plain per FEMA Maps. <br /> F. POND CONSTRUCTION DETAILS AND DESIGN <br /> 1. Embankments: Use of on-site material to construct embankments by excavating four feet <br /> of material to build up four feet of compacted embankment. Top width is to be ten feet for <br /> _ vehicle traffic. Inner slope to be 2:1, outer slope to be 3:1. Vegetation should be planted <br /> on the outer embankments, preferably low growing grass to prevent erosion. <br /> 2. Pond: Utilize 30 mil HDPE plastic to line entire surface area of inner side embankments and <br /> bottom. One foot overlap at each seam and glued. Four-inch overlength at bottom of <br /> embankment to account for soil compaction. Anchored at top of embankment as detailed <br /> in Appendix. No less than one foot minimum freeboard. Total depth of pond to be eight <br /> feet. Fencing, with warning signs shall be placed around the entire pond. <br /> 3. Piping: Influent and effluent lines to be generally accepted sewer line construction material. <br /> There should be two to three inspection ports on influent line leaving abattoir to the pond <br /> to check for fat, oil and grease (FOG) build-up. Build-up of FOG will require additional <br /> treatment of wastewater before entering pond. Influent lines should be place along the <br /> bottom, near the north end of the pond. A fresh water line must also be installed to maintain <br /> 5 <br /> Valfey Ag R�searck <br />