My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009045
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
920
>
2600 - Land Use Program
>
PA-1200011
>
SU0009045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:50 AM
Creation date
9/4/2019 6:44:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009045
PE
2626
FACILITY_NAME
PA-1200011
STREET_NUMBER
920
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
APN
19126022
ENTERED_DATE
1/30/2012 12:00:00 AM
SITE_LOCATION
920 W FREWERT RD
RECEIVED_DATE
1/27/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREWERT\920\PA-1200011\SU0009045\APPL.PDF \MIGRATIONS\F\FREWERT\920\PA-1200011\SU0009045\CDD OK.PDF \MIGRATIONS\F\FREWERT\920\PA-1200011\SU0009045\EH COND.PDF \MIGRATIONS\F\FREWERT\920\PA-1200011\SU0009045\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Source of Odor Possible Cause Management <br /> Feedstock receiving Material arrives with odor Immediately cover with green <br /> material or other high carbon <br /> material. <br /> Incorporate into the <br /> composting process as soon <br /> as possible. <br /> Monitor to insure the process <br /> prevents odor from moving <br /> off site <br /> Material becomes odorous Process and incorporate as <br /> before it is incorporated soon as possible <br /> Mist processing (grinding) <br /> area to prevent dust and odor <br /> Reduce grinding activity if <br /> wind is in direction of <br /> receptors <br /> Aisles/access roads Unprocessed material in aisles Maintain surfaces of site, <br /> slope so that water is <br /> collected in the pond. Treat <br /> with clean carbon source if <br /> necessary <br /> Ponding water on site Improve grading and <br /> drainage, absorb with <br /> material high in carbon <br /> Windrows Odor coming from windrow in Check C:N ratio and ensure it <br /> first few days is maintained at 30:1 Add <br /> bulking agent if necessary <br /> Increase turning frequency, <br /> check temperatures and <br /> moisture <br /> Curing/product storage Decrease pile size <br /> Re-incorporate and Increase <br /> time in windrow <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.