Laserfiche WebLink
pquln <br /> ?tet FPG <br /> t Z <br /> THOMAS M. GAV P.O.BOX 1810-1810 E.NAZELTON AVENUE <br /> DIRECTOR �L�1rh, 'STOCKTON,CALIFORNIA 95201 <br /> Ar <br /> ,1 (209)468-3000 FAX(209)468-2999 <br /> < coa"P <br /> �.sjgov.org/pubmrks <br /> FRITZDEPUTY <br /> BUCHMAN REC E NE D <br /> DEPUTY DIRECTOR � ' <br /> MICHAEL SELLING Wor1ding fbr YOU <br /> DEPUTY DIRECTOR JUL 112013 <br /> JIM STONE <br /> DEPUTY DIRECTOR San Joaquin County <br /> ROGER JANES Community Development <br /> BUSINESS ADMINISTRATOR <br /> July 11,2013 <br /> MEMORANDUM <br /> TO: John L. Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Stephanie Stowers <br /> FROM: Alex Chetley, Engineering Services Manager Iti9 <br /> Development Services Division <br /> SUBJECT: PA-1300087;A Minor Subdivision/Parcel Map Waiver application to subdivide an existing <br /> 162.61-acre parcel into two parcels. Parcel I to contain 55.59 acres and Parcel 2 to contain <br /> 107.02 acres; located on the south side of State Route 4 approximately one-half mile west of <br /> Escalon-Bellota Road,west of Farmington. (Supervisorial District 4) <br /> PROPERTY OWNER: Donald Sorenson APPLICANT: Wong Engineers,Inc. <br /> ADDRESS: 24226 E. State Route 4,Farmington APN: 187-110-20 <br /> INFORMATION: <br /> A portion of the site within the Littlejohns Creek limits is currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area designated as Zone A.E. The 100-year Flood Elevation ranges <br /> from approximately 103 feet to 106 feet NAVD 1988. <br /> State Route 4 has an existing right-of-way width of 80 feet and a planned right-of-way width as determined by <br /> Caltrans. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />