Laserfiche WebLink
w Rqu,w <br /> ?O � C 4 <br /> L. y <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E. HAZELTON AVENUE <br /> v'. :• DIRECTOR �"Vh. STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> �'<I�oq+` � t wwwsjgov.org/Pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR y..... <br /> MANUEL SOLORIO worldfor You <br /> DEPUTY DIRECTOR R E D 1=!V E D <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR I ) 2001 <br /> ROGERJANES OCTC, l 7❑ <br /> BUSINESS ADMINISTRATOR <br /> rnmmisnih;i Development Dept, <br /> October 25, 2006 <br /> MEMORANDUM <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Kevin Swanson <br /> FROM: Dean Gilman,Engineer IV <br /> Public Services Division 4 <br /> SUBJECT: PA-06-482 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE ONE PARCEL <br /> TOTALING 100 ACRES INTO ONE PARCEL AND A DESIGNATED REMAINDER. <br /> PARCEL ONE TO CONTAIN A TWO-ACRE HOMESITE PARCEL AND A DESIGNATED <br /> REMAINDER PARCEL TO CONTAIN 98 ACRES, LOCATED ON THE NORTHEAST <br /> CORNER OF BUCKMAN ROAD AND STATE HIGHWAY ROUTE 4. (SUPERVISORIAL <br /> DISTRICT 4) <br /> PROPERTY OWNER: Ema Murphy Trust APPLICANT: Dillon&Murphy <br /> ADDRESS: 27403 E. State Highway Route 4 APN: 187-310-07 & 12 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Buckman Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> State Highway Route 4 has an existing and a planned right-of-way width as determined by Caltrans. <br /> Funck Road has a variable existing right-of-way width and a planned right-of-way width of 50-feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed.The fee is due and payable at the <br /> time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br />