My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006578
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
5 (I-5)
>
0
>
2600 - Land Use Program
>
PA-0700226
>
SU0006578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:36:10 AM
Creation date
9/4/2019 6:46:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006578
PE
2637
FACILITY_NAME
PA-0700226
STREET_NUMBER
0
STREET_NAME
I-5
City
LODI
APN
05515003 04 25
ENTERED_DATE
5/18/2007 12:00:00 AM
SITE_LOCATION
I-5
RECEIVED_DATE
5/18/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\F\I-5\0\PA-0700226\SU0006578\GRD WTR PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 10-1 Construction Details <br /> Std. Spec_ Sec_ 70 <br /> Special S1 <br /> Page 4 of S <br /> place, clean- out or re-drill the borehole before well <br /> installation- Dispose of soil cuttings by spreading in a <br /> maximum 2-inch thick layer next to drill holes- <br /> C_ In the event that the borehole was over-drilled, install <br /> well casing to the depth drilled_ Payment for over-drill <br /> depth beyond the design depth will not be made. <br /> WELL INSTALLATION: <br /> A_ Provide Imhoff cone to measure settleable solids_ <br /> B_ Request the Engineer to calculate volumes of sand pack, <br /> bentonite and neat cement required, based on borehole and <br /> well casing dimensions.- <br /> C_ Install the casing, screen and other well construction <br /> materials in the presence of the Engineer_ Install the PVC <br /> pipe, slotted PVC well screen., sand packs, bentonite seal <br /> and neat cement seal as indicated on the Plans in the <br /> presence of the Engineer_ <br /> D_ Connect and carefully lower the well casing assembly to <br /> { required depth- <br /> I- Attach a casing centralizer at the bottom of the <br /> screened interval and just above the screened interval to <br /> i assure that the well is centered in the borehole_ <br /> s <br /> 2_ Suspend the well. casing assembly using the drill rig and <br /> do not rest the casing on the bottom of hole_ Extend the <br /> top of the well casing above ground surface as shown in the <br /> drawings_ - - - - - --- <br /> i E_ In the event the well casing assembly is dropped, lowered <br /> abruptly, or for any other reason suspected of being damaged <br /> during placement, remove the well casing assembly from the <br /> borehole for inspection by the Engineer. <br /> F_ if. the well casing assembly rises after being placed in the <br /> ' borehole due to heaving formation material, do not place any <br /> drilling equipment (drill pipe, hammers, etc_) to prevent <br /> � ` . the casing from rising- Notify the Engineer of the amount <br /> of rise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.