My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010965
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0010965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 8:46:59 AM
Creation date
9/5/2019 8:18:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010965
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological neclmks lKc. Page 3 <br /> Well Abandonment Report <br /> Project No.750.2 <br /> January 12,2006 <br /> the Work Plan — Well Abandonment. Ms Duncan approved the work plan with notation on well <br /> abandonment procedure in a letter dated August 31, 2005. The following report discusses the <br /> destruction/abandonment of all wells associated with the COE site. <br /> 2.0 WELL ABANDONMENT <br /> There were five (5) water table, one (1) deep monitoring and four (4) vapor extraction wells <br /> associated with the COE site. GTI properly decommissioned these wells in an effort to meet <br /> requirements leading to a "No Further Action Letter". All monitoring wells associated with the <br /> site were monitored regularly and were in good condition. No obstacles were observed in any <br /> well. A summary of well construction is included as Table 1 in Appendix A and well locations <br /> are denoted in Figure 2. <br /> Woodward Drilling Company of Rio Vista, California (C-57 Lie #710079) was employed to <br /> decommission the wells associated with the COE site. Permits were secured as necessary and the <br /> local regulatory agency was notified 48 hours prior to commencing work. <br /> There was a large vault constructed on-site that housed the manifold for the vapor extraction <br /> system. Del-Tech Geotechnical Support Services using a backhoe removed the vault. The <br /> manifold was removed from the wellheads and associated piping. <br /> Wells: MW-1 MW-2 MW-4 MW-5 MW-101 VEW-3 and VEW-4 <br /> These wells, located on-site, were of typical vertical well construction. These wells were <br /> abandoned using the following procedure: <br /> • The well box and supporting concrete apron were removed by backhoe. <br /> • A vacuum truck and "wet" knife were used to excavate a hole approximately 1-foot larger in <br /> diameter than the original borehole around the annular to a depth of approximately 3 feet <br /> below grade. <br /> • The soil was stored, on-site, in DOT approved steel drums until disposal was arranged. <br /> • Grout was pumped into each well casing using 3/ inch diameter tremie pipe while displaced <br /> water was pumped into a DOT approved steel drum until disposal was arranged. It was noted <br /> that very little displaced water was present. <br /> • Pressure of approximately 35 psi was applied to each well casing for approximately 5 <br /> minutes. <br /> • The well casing was then cut off approximately 6-inches above the base of the excavated <br /> hole. <br /> • Grout was pumped into the "cut" well casing and allowed to mushroom over the casing and <br /> fill the bottom 12 to 18 inches of the excavated hole. <br /> ..r <br /> • The excavated hole was backfilled to grade with clean overburden. <br /> Wells: VEW-1 and VEW-2 <br /> These wells were located approximately 20 feet east of the site beneath Escalon Avenue. The <br /> ..� vertical extraction wells were connected to the manifold, located in the vault discussed above,by <br />
The URL can be used to link to this page
Your browser does not support the video tag.