My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010968
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0010968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 8:51:05 AM
Creation date
9/5/2019 8:28:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010968
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creological rechAld Inc Page 9 <br /> Groundwater Monitoring Report <br /> Project No.750.2 <br /> February 16,2005 <br /> Middleton, San Joaquin Valley Air Pollution Control District (SJVAPCD) on September 24, <br /> 2004. <br /> During the initial inspection Ms. Middleton requested that the initial laboratory sample <br /> analysis be submitted to the SJVAPCD in accordance to the Authority to Construct: N-4546- <br /> 2-1 Section 15 (ATC). Ms. Middleton stated that the submission of monthly and annual <br /> reports is not required. As per the ATC, records of all site activities, field measurements, <br /> laboratory results and other compliance requirements are kept by GTI and are available for <br /> SJVAPCD inspection upon request. <br /> During the November 30, 2004, monitoring event elevated Organic Vapor Meter (OVM) <br /> readings were encountered. It was determined that water was forming in the carbon vessels <br /> due to elevated heat created by the blower. The water was removed from the vessels and <br /> ambient air was passed through the carbon units for fourteen days to dry out the carbon. The <br /> removed water was stored in 55-gallon drums until disposal was arranged. <br /> During the second week of December 2004, Del-Tech personnel reconfigured the SVE <br /> system so that it pulls the vapor through the vessels prior to contacting the blower. This <br /> procedure eliminated the heat added to the air stream via the blower and reduced the amount <br /> of condensation in the carbon vessels. Del-Tech also replaced the rotometer with a more <br /> accurate sensor-type air speed indicator. <br /> 4.1 System Efficiency <br /> The SVE system is operated under the authority of the San Joaquin Valley Unified Air <br /> Pollution Control District's (SJVUAPCD) Authority To Construct (N-4546-2-1). The <br /> monthly efficiency data calculated since the system was placed into operation in September <br /> 2004 are summarized in the table below: <br /> Date Influent ppm i Effluent(ppm)i Effeciency(%)2 Effeciency(%)3 <br /> 09/24/04 36.9 0.7 99.98 98.10 <br /> 09/27/04 42.8 0.6 99.99 98.60 <br /> 10/04/04 19.6 0.1 99.99 99.49 <br /> 10/13/04 41.3 0.1 100.00 99.76 <br /> 10/20/04 74.3 0.0 100.00 100.00 <br /> 10/25/04 63.2 0.0 100.00 100.00 <br /> 11/03/04 46.7 0.0 100.00 100.00 <br /> 11/09/04 32.3 0.2 99.99 99.38 <br /> 11/22/04 1 68.91 2.11 99.971 96.95 <br /> 11/30/04 232.91 17.71 99.92 92.40 <br /> Averages= 65.891 2.21 99.97 96.74 <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.