My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1360
>
3500 - Local Oversight Program
>
PR0544807
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 9:07:37 AM
Creation date
9/5/2019 8:55:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544807
PE
3528
FACILITY_ID
FA0009157
FACILITY_NAME
McDowell & Davis Towing & Auto Repair
STREET_NUMBER
1360
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22706108
CURRENT_STATUS
02
SITE_LOCATION
1360 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is the responsibility of the Project Manager and the Health and Safety Manager to review the available site <br /> information to determine,to what degree the Health and Safety Plan will be implemented. Each site will be <br /> handled on a case-by-case basis. <br /> 2.0 SAFETY IMPLEMENTATION <br /> The provisions of the M.J.Kloberdanz&Associates Health and Safety Plan are mandatory for all personnel associated <br /> with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to deter-mine whether specific <br /> amendments are to be made to the Health and Safety Plan based on specific characteristics which may exist on the job <br /> site. Any suspected hazards associated with the on-site operation which exposure to, via inhalation or skin absorption, <br /> to such as suspected carcinogens or human sterilants,will be documented and specific guidance will be developed and <br /> added to this Health and Safety Plan as Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site investigations. The project site <br /> layout has built-in safety features.The site is divided into three zones.The following list defines the required personnel <br /> protective equipment. <br /> 2.1 Personnel Protective Equipment(PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the following <br /> protective equipment and measures as warrant by the Project Manager: <br /> Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves(inner) <br /> PVC,Nitrile or Neoprene outer gloves <br /> Hard hat <br /> Steel toe boots <br /> - Robars or Tingley boots cede, <br /> Full face-piece respirator with R53HE cartridges(a combination of organic vapor,acid gas,peso <br /> radionuclide,high efficiency filter). Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if necessary. This determination will <br /> be made by the project supervisor after review of the materials to be handled,the ambient monitoring data, <br /> consultation with on-site technical personnel, the Safety Officer, and the proper management personnel. <br /> Upgrades in PPE,if necessary,will be implemented. <br /> 2.2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day,prior to commencing work, a safety meeting shall be held to discuss safety considerations for the <br /> day's work to be done.A safety topic shall be addressed each day from the following list: <br /> - Site Safety Plan(first day and once a week thereafter) <br /> - Fire Fighting Techniques <br /> - Defensive Driving <br /> - Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> - Emergency Equipment on Site <br /> Confined Space Entry Procedure- Respirator Maintenance <br /> Self-contained Breathing Apparatus Training(if necessary) <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.