My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
6250
>
2900 - Site Mitigation Program
>
PR0542086
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:03:21 PM
Creation date
9/5/2019 9:23:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542086
PE
2965
FACILITY_ID
FA0004502
FACILITY_NAME
NORMANS NURSERY
STREET_NUMBER
6250
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09317009
CURRENT_STATUS
02
SITE_LOCATION
6250 ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> Brigs[People...........ani <br /> • opened and water is allowed to discharge to Potter Creek. When this <br /> happens, the dewatering wells must either be shut down or the water diverted <br /> to holding tanks to limit the flow of the high nitrate-nitrogen concentration <br /> water from entering Potter Creek. <br /> This BMP is still being used as modified above. <br /> 6. Norman's Nursery installed a calibrated depth gauge in on-site Basin B. The <br /> gauge is read daily. This data is useful in assessing the water loss from the <br /> basin because of evaporation and infiltration. <br /> The water level measuring gauge was removed during maintenance of <br /> the basin in October of 2003 and should be replaced to implement this <br /> BMP. <br /> 7. Norman's Nursery collects and analyzes water samples from the on-site run- <br /> off basin monthly. Water from the discharge of the dewatering wells also is <br /> • pumped to the Basin B and sampled weekly. The samples are analyzed for <br /> nitrate concentrations. KI-Nitrifier (a biological additive which increases nitrate <br /> consumption in the basin) is added when high concentrations of nitrate are <br /> reported in the samples. Basin water is reused in water trucks onsite for dust <br /> control, as needed. <br /> This BMP is still being used. <br /> 8. Quarterly, the water contained in Basin B is sampled and analyzed for nitrate. <br /> This BMP has been implemented for nitrates-nitrogen and ammonia- <br /> nitrogen analysis; and only when the culverts are closed and Basin B <br /> contains irrigation tailwater. Otherwise, the discharge from Basin B is <br /> sampled(see MRP by the RWQCB). <br /> • <br /> 117226.E02/ST012R0696 Page 31 of 43 September 14, 2012 <br /> Copyright 2012 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.