Laserfiche WebLink
quill <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> � DEPUTY DIRECTOR <br /> 2' n <br /> e . DEPARTMENT OF PUBLIC WORK <br /> p.O.BOX 1810-1810 E. HAZELTON AVENUE THOMAS M.GAU <br /> • �, :• STOCKTON,CALIFORNIA 95201 DEPUTY DIRECTOR <br /> 9lldOa'' (209)468-9000 <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> NKLER <br /> DIRECTOR STEVEN WI <br /> DEPUTY DIRECTOR <br /> January 10, 2001 <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jim Van Buren <br /> FROM: G K Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: AR (REVISION) A <br /> UCK PITE ARKING FOR ONE TRUCK AND TWO VAL APPLICATION TO OTRAILERS <br /> GRICULTURAL <br /> ON A 17.04-ACRE PARCEL, LOCATED ON THE SOUTH SIDE OF <br /> GRANT LINE ROAD, 600 FEET EAST OF BYRON ROAD. (DISTRICT 5). <br /> APNs: 209-270-30 and <br /> APPLICANT: Grant Line Apartments, LLC 209-270-31 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area, <br /> Grant Line Road has an existing right-of-way width of 60 feet and a planned right-of-way width <br /> of 110 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3, The and Taaable at the time otion f buFdin ee wllebmit a uI I cat onthis <br /> The feedevelopment. <br /> currrentl The <br /> fee <br /> 182.1 gue <br /> lit <br /> er dail tri -end enerated in the Trac area. The fee shall be automaticall ad usted <br /> Jul 1 of each ear b the En ineerin Construction Cost Index as ublished b the <br /> Enaineerino News Record.) <br /> Resolutions R 90 304 R-91-1025R 93 167 R-94-179 R-95-650 ander�) <br /> 4- A copy of the Final Site Plan shall be submitted prior to release of building permits. <br /> GK:SH:mr <br /> PS-1AONW1 wPdR <br /> E: Thomas M. Gau, Deputy Director/Development <br />