Laserfiche WebLink
all command functions of the gate controller.Electric gate operators shall be listed in <br /> accordance with UL 325 and ASTM F2200.Knox switches shall be provided on both sides <br /> of the gates unless an exit loop is provided at automatic gates.The automatic gates shall <br /> have a battery back-up or a manual mechanical disconnect readily accessible to emergency <br /> personnel in case of power failure. <br /> h. Prior to approval of building construction permit,applicant shall submit construction <br /> documents to the South San Joaquin County Fire Authority for review and approval. <br /> Electronic submittal is encouraged,but not mandatory. <br /> 2. At time of application to South San Joaquin County Fire Authority,additional requirements may <br /> be required based on submittal and review. <br /> 3. Prior to final inspection,emergency radio responder coverage shall be tested for each building in <br /> accordance with 2016 CFC Section 510. If adequate coverage is not available,applicant shall <br /> apply for a construction permit for installation. <br /> Plans Reviewed by: <br /> Courtney Wood,Plans Examiner <br /> (209)831-6707 <br /> courtney.wood(ebc ityoftracy.org <br /> -End- <br /> z <br />