Laserfiche WebLink
Open Space Plan (SJMSCP) and is located in the unmapped area. Per requirements of <br /> the SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90- <br /> day process and it is recommended that the applicant contact SJMSCP staff as early as <br /> possible. a <br /> This project may require a traffic study. An environmental review of this project can not <br /> be completed until the above information is provided. The Community Development <br /> Department wli-t not make a recommendation on this project until the environmental <br /> review is completed. This item is tentatively scheduled for the Planning Commission <br /> hearing on November 18, 2010. If a favorable recommendation can be made, the <br /> following conditions will likely apply: <br /> Use Permit Application No. PA-1000217 was approved by the Planning Commission <br /> on. The effective date of approval is. This approval will expire on, which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval <br /> have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in,force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ;Ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other Ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact Staff: Corinne King, [209] <br /> 953-7509) .,> <br /> a. BUILDINi G PERMIT: Submit an "APPLICATION-COMMERCIAL• BUILDING <br /> PERMIT,". The Site Plan required as a part of the building permit must'be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway. access details including gates, -on-site parking, landscaping, signs, <br /> existing'[Jand proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' fdt details). A fee is,required for the Site Plan review. (Development Title <br /> Section9-884) <br /> b. APPROVED USE: This approval is to expand an existing neighborhood religious <br /> assembly with 200 members to a regional religious assembly for 800 members in <br /> two phases. Phase One to include a 19,940 square foot assembly hail. Phase <br /> Two to'iriclude a 9,600 square foot kitchen and dining hall, as shown on the site <br /> plan dated September 13, 2010. (Use Type: Religious Assembly-Regionai) <br /> c. CAPIT4:. FACILITY FEE: This project may be subject to the Capital Facility Fee. <br /> If the Capital Facility Fee is applicable, the County shall collect the fees before the <br /> issuancq.;of any building permits. (Development Title Section 9-1245.2) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All Parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base ,material of appropriate depth.and asphalt <br /> coni to provide a durable, dust free surface. Bumper guards shall be <br /> DC MEMO -3 - PA-1000217 <br /> _a <br />