Laserfiche WebLink
Mountain House Specific Plan III — <br /> ........................................................................................................................................................................... <br /> Future regional trails leading from Alameda or Contra Costa County to the Mountain House area shall — <br /> connect to the pedestrian and bicycle network within the community. Potential regional trails include <br /> those planned by the East Bay Regional Park District and Livermore Area Recreation and Park District. <br /> Wherever possible, such trails shall provide access to destinations within Mountain House,including the <br /> Old River Regional Park and Mountain House Creek Park. <br /> Should the National Park Service decide to extend the De Anza Trail into the Mountain House area,the <br /> trail shall be accommodated through connections to the Mountain House pedestrian and bicycle network, <br /> and identified with signage. The most likely alignment would be to provide trail routing along proposed <br /> Class I bike lanes that parallel Great Valley Parkway from Kelso Road to Grant Line Road. <br /> 7.2.4.2 Specific Plan IH Description <br /> An open space system of trails is provided along the existing utility easement corridors as shown <br /> diagrammatically in Figure 7-1.Open space areas will require a separate funding mechanism to finance <br /> the cost of maintenance by the MHCSD. All open space areas shall be addressed as conditions of the <br /> Tentative Map. <br /> Specific Plan III also provides for the design and location of on-site trails and linkages to destinations <br /> within the community,as shown by Figure 7-5. These trails may provide linkages to trails planned by the — <br /> East Bay Regional Park District, the Livermore Area Recreation and Park District, and the National Park <br /> Service (De Anza Trail). <br /> 7.2.4.3 Implementation Measures <br /> a. Open spaces shall be provided as shown in Figure 7-1. <br /> b. Pedestrian and bicycle trails and linkages shall be provided as shown in Figure 7-5. <br /> c. The design of all implementing public improvements including paths,alignment, standards, signage, _ <br /> location of trailheads or staging areas, shall comply with the applicable provisions of the MHCSD <br /> Design Manual. <br /> d. Timing of Construction-Construction of Open Space Improvements may be completed on a phased <br /> basis to correspond with the development of neighborhoods,or parcels as determined by the <br /> MHCSD,directly adjacent to the facility. Open Space improvements to a specific segment shall be <br /> completed no later than the time at which 80%of dwelling units for the neighborhood, or adjacent <br /> parcels, have been issued final inspection. (The MHCSD General Manager may require completion <br /> of the improvements to an earlier date if it is deemed necessary). <br /> e All feasible pedestrian connections to schools and at the end of cul-de-sacs shall be included within <br /> improvement plans and constructed as provided in SPIII. In instances where the proposed location of <br /> 7-12 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />